Site & civil
Confirm floor capacity, slab tolerances, dock ramps, charging room ventilation, egress and outdoor exposure limits.
EvidenceApproved drawings, survey and site readiness recordA forklift or stacker project crosses operations, EHS, facilities, maintenance, battery or fuel infrastructure and often WMS or fleet-management interfaces. Our working principle is simple: important assumptions, ownership boundaries and acceptance evidence should be visible early enough for the right people to challenge them before truck class and attachment decisions harden.
Planning references in the brand seed—such as a 2007 generated-range year, approximately 250+ people, 30 countries or 900+ SKUs—are retained only as internal orientation. They are not published here as independently verified corporate claims.

Titles vary by project, but every load rating, aisle width, traffic rule, control state and test result needs an owner. The matrix should identify who provides input, who approves, who performs work and who receives the evidence.
Confirm floor capacity, slab tolerances, dock ramps, charging room ventilation, egress and outdoor exposure limits.
EvidenceApproved drawings, survey and site readiness recordDefine truck class, residual capacity, attachments, guarding, maintenance access and documented limitations.
EvidenceApplication worksheet, capacity summary and equipment test recordMap WMS, WCS, FMS or PLC handshakes across normal, blocked-aisle and recovery states when tasking is automated.
EvidenceState diagram, I/O list and cause-and-effect reviewApprove traffic procedures, exclusion zones, manual modes, training boundaries and restart authorization after an exception.
EvidenceOperating procedure, training and SAT observationFactory and site acceptance are not interchangeable. FAT can verify defined lift, travel and control behavior before shipment, while SAT proves installation, interfaces and operating sequences in the real warehouse. The test basis should state preconditions, loads, roles, observations and how failed steps are closed.
Where a truck aisle enters a live fulfillment operation, commissioning also needs a traffic plan, fallback positions and authority to stop. A phased release can protect continuity, but only if operators know which aisles and modes are available during each window.
Freeze load units, access rules, interface responsibilities and acceptance criteria before configuration decisions become expensive.
Exercise agreed sequences, alarms and recovery cases within the available factory boundary; record exclusions for site verification.
Verify geometry, chargers, guidance devices, labels and guarded areas before energized operational testing.
Observe representative loads and peak windows, close exceptions, deliver documentation and confirm who authorizes ongoing operation.
Application, integration and documentation support is defined by project scope. Equipment models, local regulations, service agreements, geography and site access determine the actual response path; they should not be replaced by a generic global coverage claim.
Coordinate aisle dimensions, utilities, interfaces, charging rooms, delivery sequence and responsibilities.
Use approved test steps, representative pallet conditions, issue tracking and signed handover evidence.
Connect inspection, maintenance, spares, diagnostics and escalation to the operating profile.